Solution

Ecuador Multipurpose Wharf

The total solutions cover high voltage, medium voltage, low voltage, transformer, reactive compensation, emergency power supply and SCADA system, satisfying the requirements specified in local codes

Ecuador Multipurpose Wharf

Reduce the field installation and commissioning work, and cut down the on-site construction time, satisfying the tight schedule required for the project

Benefits
A
Expansion of overseas business considering that overseas projects have political influence
B
Successful installation and energization of electrical system
C
Composite apparatus with compact structural design realizes maintenance-free operation
D
The mobility of E-house enables customers to avoid overlapping investment
E
Less labor, less time and reduced costs in field installation, commissioning and test run
F
Reduced costs in engineering design, coordination, management and procurement
G
Easy and fast installation and commissioning
H
Operable in harsh environment, and capable of reducing the incidence of major accidents